Minimizing the number of machines for minimum length schedules
From MaRDI portal
Publication:1042210
DOI10.1016/j.ejor.2006.11.050zbMath1176.90210OpenAlexW2093084490MaRDI QIDQ1042210
Maurice Queyranne, Jean Marie Proth, Pierre Lemaire, Gerd Finke
Publication date: 7 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2006.11.050
Related Items
Hybrid flow shop scheduling with not-all-machines options via local search with controlled deterioration, The optimal number of used machines in a two-stage flexible flowshop scheduling problem, Batch scheduling in a two-stage flexible flow shop problem, Minimizing the number of machines with limited workload capacity for scheduling jobs with interval constraints, Scheduling unrelated parallel machines with optional machines and jobs selection
Cites Work
- On the minimum number of processors for scheduling problems with communication delays
- Upper bound on the number of processors for scheduling with interprocessor communication delays.
- Optimal scheduling for two-processor systems
- Scheduling with Deadlines and Loss Functions
- Hu's precedence tree scheduling algorithm: A simple proof
- Scheduling Flat Graphs
- Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem
- Scheduling Opposing Forests
- Preemptive Scheduling of Real-Time Tasks on Multiprocessor Systems
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item