New multi-objective method to solve reentrant hybrid flow shop scheduling problem

From MaRDI portal
Publication:1043329

DOI10.1016/j.ejor.2009.06.031zbMath1176.90205OpenAlexW2033739616MaRDI QIDQ1043329

Frédéric Dugardin, Lionel Amodeo, Farouk Yalaoui

Publication date: 7 December 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2009.06.031




Related Items (17)

Security based bi-objective flow shop scheduling model and its hybrid genetic algorithmHybrid Taguchi-based particle swarm optimization for flowshop scheduling problemInequity averse optimization in operational researchA holonic approach to flexible flow shop scheduling under stochastic processing timesAn enhanced tabu search algorithm to minimize a bi-criteria objective in batching and scheduling problems on unrelated-parallel machines with desired lower bounds on batch sizesBicriteria scheduling problem for unrelated parallel machines with release datesHybrid flow shop scheduling with not-all-machines options via local search with controlled deteriorationAn MO‐GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problemEfficient algorithms for flexible job shop scheduling with parallel machinesA systematic review of multi-objective hybrid flow shop schedulingEffective upper and lower bounds for a two-stage reentrant flexible flow shop scheduling problemLorenz dominance based algorithms to solve a practical multiobjective problemInventory based bi-objective flow shop scheduling model and its hybrid genetic algorithmA simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportationGame theory based evolutionary algorithms: a review with Nash applications in structural engineering optimization problemsBicriteria hierarchical optimization of two-machine flow shop scheduling problem with time-dependent deteriorating jobsFair optimization and networks: a survey


Uses Software


Cites Work




This page was built for publication: New multi-objective method to solve reentrant hybrid flow shop scheduling problem