Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Production planning and scheduling for an integrated container company

From MaRDI portal
Publication:1058968
Jump to:navigation, search

DOI10.1016/0005-1098(85)90080-9zbMath0565.90026OpenAlexW1980228679MaRDI QIDQ1058968

Robert W. Haessler

Publication date: 1985

Published in: Automatica (Search for Journal in Brave)

Full work available at URL: http://hdl.handle.net/2027.42/25634


zbMATH Keywords

schedulinghierarchy of modelsproduction planningpaper industry


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items (2)

Knowledge based approach to the cutting stock problem ⋮ Scheduling of corrugated paper production



Cites Work

  • A Linear Programming Approach to the Cutting-Stock Problem
  • Technical Note—A Note on Computational Modifications to the Gilmore-Gomory Cutting Stock Algorithm
  • Controlling Cutting Pattern Changes in One-Dimensional Trim Problems
  • A Linear Programming Approach to the Cutting Stock Problem—Part II
  • The Set-Partitioning Problem: Set Covering with Equality Constraints
  • A Heuristic Programming Solution to a Nonlinear Cutting Stock Problem
  • An Effective Heuristic Algorithm for the Traveling-Salesman Problem
  • Unnamed Item


This page was built for publication: Production planning and scheduling for an integrated container company

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1058968&oldid=13076339"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 00:41.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki