Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times

From MaRDI portal
Publication:1060679
Jump to:navigation, search

zbMath0568.90040MaRDI QIDQ1060679

Kanta Khurana, P. C. Bagga

Publication date: 1985

Published in: Indian Journal of Pure \& Applied Mathematics (Search for Journal in Brave)


zbMATH Keywords

algorithmdeadline schedulingprocessing timestwo-machine flow shopset-up timesschedule of minimum length


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

Uma propriedade estrutural do problema de programação da produção flow shop permutacional com tempos de setup







This page was built for publication: Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1060679&oldid=13071935"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 23:28.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki