Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length
DOI10.1016/0377-2217(85)90129-8zbMath0572.90052OpenAlexW1968233780MaRDI QIDQ1062615
Publication date: 1985
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(85)90129-8
production schedulingparallel machinespolynomial-time algorithmidentical machinesminimum lengthunit-time operations
Analysis of algorithms and problem complexity (68Q25) Numerical mathematical programming methods (65K05) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (2)
Cites Work
This page was built for publication: Scheduling lots of dependent unit-time operations on identical machines to minimize schedule length