A cost minimization procedure for mixed model production lines with normally distributed task times
From MaRDI portal
Publication:1068704
DOI10.1016/0377-2217(86)90211-0zbMath0582.90049OpenAlexW1975205801MaRDI QIDQ1068704
Avraham Shtub, Amiya K. Chakravarty
Publication date: 1986
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(86)90211-0
Numerical mathematical programming methods (65K05) Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items
A classification of assembly line balancing problems ⋮ Second order conic approximation for disassembly line design with joint probabilistic constraints ⋮ Lot-sizing in a class of multistage production inventory systems ⋮ Multi-stage production-inventory systems ⋮ Sequencing jobs on an automobile assembly line: objectives and procedures ⋮ Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions ⋮ A survey on problems and methods in generalized assembly line balancing
Cites Work
- Assembly line balancing as generalized bin packing
- Non-inteǵer optimal lot size ratios in two-staǵe production/inventory systems
- Technical Note—A Partitioning Problem with Additive Objective with an Application to Optimal Inventory Groupings for Joint Replenishment
- Note—On the Optimality of Integer Lot Size Ratios in “Economic Lot Size Determination in Multi-Stage Assembly Systems”
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- A 98%-Effective Lot-Sizing Rule for a Multi-Product, Multi-Stage Production / Inventory System
- On Assembly-Line Balancing Problems
- Mixed Model Line Balancing with Smoothed Station Assignments
- Production-Line Balances for Mixed-Model Lines
- Economic Lot Size Determination in Multi-Stage Assembly Systems
This page was built for publication: A cost minimization procedure for mixed model production lines with normally distributed task times