Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Some no-wait shops scheduling problems: Complexity aspect - MaRDI portal

Some no-wait shops scheduling problems: Complexity aspect

From MaRDI portal
Publication:1079487

DOI10.1016/0377-2217(86)90036-6zbMath0597.90045OpenAlexW1967348328MaRDI QIDQ1079487

Chelliah Skriskandarajah, Pierre Ladet

Publication date: 1986

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(86)90036-6



Related Items

Minimizing makespan in hybrid flowshops, A survey of job shop scheduling problem: the types and models, An efficient algorithm for a job shop problem, The proportionate two-machine no-wait job shop scheduling problem, Is a unit-job shop not easier than identical parallel machines?, Identical parallel machines vs. unit-time shops and preemptions vs. chains in scheduling complexity, Two-stage no-wait hybrid flowshop scheduling with inter-stage flexibility, A new heuristic for minimal makespan in flow shops with multiple processors and no intermediate storage., On Eulerian extensions and their application to no-wait flowshop scheduling, A pseudo-polynomial algorithm for a two-machine no-wait job-shop scheduling problem, An introduction of dominant genes in genetic algorithm for FMS, Minimum deviation algorithm for two-stage no-wait flowshops with parallel machines, Scheduling algorithms for flexible flowshops: Worst and average case performance, Minimizing total completion time in two-machine flow shops with exact delays, Complete local search with limited memory algorithm for no-wait job shops to minimize makespan, Combinatorial optimization models for production scheduling in automated manufacturing systems, Modified drum–buffer–rope scheduling mechanism for a non-identical parallel machine flow shop with processing-time variation, A two-machine no-wait flow shop problem with two competing agents, Two-machine shop scheduling with zero and unit processing times, Scheduling multipurpose batch process industries with no-wait restrictions by simulated annealing, Minimizing Total Completion Time in Two-Machine Flow Shops with Exact Delays, The complexity of scheduling jobs in repetitive manufacturing systems, Performance of scheduling algorithms for no-wait flowshops with parallel machines, On scheduling cycle shops: Classification, complexity and approximation, The hot strip mill production scheduling problem: A tabu search approach



Cites Work