A mixed integer program for loading and scheduling multiple flexible manufacturing cells
From MaRDI portal
Publication:1082246
DOI10.1016/0377-2217(86)90031-7zbMath0602.90067OpenAlexW2055722863MaRDI QIDQ1082246
Randall P. Sadowski, Timothy J. Greene
Publication date: 1986
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(86)90031-7
schedulingloadingminimizing makespanflexible manufacturing systemminimizing mean flowtimeminimizing mean latenessmultiple, flexible manufacturing cells
Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Production models (90B30)
Related Items (12)
Loading and scheduling for flexible manufacturing systems with controllable processing times ⋮ A comprehensive review of flowshop group scheduling literature ⋮ A production planning problem in FMS ⋮ Metaheuristics for scheduling a non-permutation flowline manufacturing cell with sequence dependent family setup times ⋮ Shop floor control and tool loading policies in flexible manufacturing systems ⋮ The relationship between part type demand and FMS loading policies ⋮ Optimal inventory costs in a complementary flexible manufacturing system ⋮ A global MILP model for FMS scheduling ⋮ A flexible approach to (re)configure flexible manufacturing cells ⋮ Mixed integer programming for scheduling flexible flow lines with limited intermediate buffers ⋮ Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line ⋮ Analytical loading models in flexible manufacturing systems
Cites Work
- Unnamed Item
- KBSS: A knowledge-based system for scheduling in automated manufacturing
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- A Review of Production Scheduling
- Job-Shop Scheduling by Implicit Enumeration
- A Branch-Bound Solution to the General Scheduling Problem
- Review of sequencing research
This page was built for publication: A mixed integer program for loading and scheduling multiple flexible manufacturing cells