Reconstruction of a consistent schedule in connection with change of the volume of a job
From MaRDI portal
Publication:1087470
DOI10.1007/BF01091798zbMATH Open0611.90062MaRDI QIDQ1087470
Publication date: 1987
Published in: Journal of Soviet Mathematics (Search for Journal in Brave)
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Related Items (1)
This page was built for publication: Reconstruction of a consistent schedule in connection with change of the volume of a job
Report a bug (only for logged in users!)Click here to report a bug for this page (MaRDI item Q1087470)