Optimal total-work-content-power due-date determination and sequencing
From MaRDI portal
Publication:1097161
DOI10.1016/0898-1221(87)90184-2zbMath0634.90028OpenAlexW1965688964MaRDI QIDQ1097161
Publication date: 1987
Published in: Computers \& Mathematics with Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0898-1221(87)90184-2
Related Items
Survey of scheduling research involving due date determination decisions, Scheduling job classes on uniform machines, A simpler and faster algorithm for optimal total-work-content-power due data determination
Cites Work
- Optimal Due-Date Determination and Sequencing of n Jobs on a Single Machine
- Optimal due-date assignment in a job shop†
- Simulation study of job shop scheduling with due dates
- Due Date Assignment for Production Systems
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem