Optimal common due-date with limited completion time deviation

From MaRDI portal
Publication:1097833

DOI10.1016/0305-0548(88)90001-9zbMath0635.90050OpenAlexW2119985088MaRDI QIDQ1097833

Cheng, T. C. Edwin

Publication date: 1988

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(88)90001-9




Related Items (26)

Scheduling with monotonous earliness and tardiness penaltiesDue window scheduling for parallel machinesEarliness-tardiness scheduling problems with a common delivery windowSingle-machine due-window assignment and scheduling with job-dependent aging effects and deteriorating maintenanceOptimal common due-date with completion time toleranceIterated search methods for earliness and tardiness minimization in hybrid flowshops with due windowsSurvey of scheduling research involving due date determination decisionsSingle machine scheduling with common due data assignment in a group technology environmentSingle-machine scheduling problems with both start-time dependent learning and position dependent aging effects under deteriorating maintenance considerationSoft due window assignment and scheduling of unit-time jobs on parallel machinesSingle-Machine Scheduling Problems Simultaneous with Deteriorating and Learning Effects Under a Deteriorating Maintenance ConsiderationCON due-date determination and sequencingSingle machine scheduling with simple linear deterioration to minimize total absolute deviation of completion timesTwo-stage medical supply chain scheduling with an assignable common due window and shelf lifeSingle-machine scheduling with piece-rate maintenance and interval constrained position-dependent processing timesA single machine scheduling problem with earliness/tardiness and starting time penalties under a common due dateSingle-machine scheduling with a common due windowOn scheduling around large restrictive common due windowsParallel machine scheduling with a common due windowDetermination of common due window location in a single machine scheduling problemOptimal common due-date with limited completion timeAn approximation algorithm for a supply-chain scheduling problem with an assignable common due window and holding timeA two-echelon inventory optimization model with demand time window considerationsMinimizing total earliness and tardiness on re-entrant batch processing machine with time windowsA survey of the state-of-the-art of common due date assignment and scheduling researchSingle machine scheduling with symmetric earliness and tardiness penalties



Cites Work


This page was built for publication: Optimal common due-date with limited completion time deviation