Disaggregation under uncertainty in hierarchical production planning
From MaRDI portal
Publication:1100090
DOI10.1016/0377-2217(88)90027-6zbMath0639.90052OpenAlexW2001002212MaRDI QIDQ1100090
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90027-6
disaggregationuncertaintyhierarchical planninghierarchical production planningsingle-stage manufacturing system
Applications of mathematical programming (90C90) Deterministic scheduling theory in operations research (90B35) Hierarchical systems (93A13) Dynamic programming (90C39)
Related Items (6)
A bi-objective aggregate production planning problem with learning effect and machine deterioration: modeling and solution ⋮ Hierarchical model for production planning in the case of uncertain demand ⋮ A simulation factory control model under a chance constraint ⋮ Hierarchical production planning and scheduling in a multi-product, batch process environment ⋮ Models for robust tactical planning in multi-stage production systems with uncertain demands ⋮ Disaggregation to a rolling horizon master production schedule with minimum batch-size production restrictions
Cites Work
This page was built for publication: Disaggregation under uncertainty in hierarchical production planning