Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure
From MaRDI portal
Publication:1107425
DOI10.1016/0377-2217(88)90200-7zbMath0652.90055OpenAlexW2006692437MaRDI QIDQ1107425
In-Jazz Chen, George L. Y. Cheng, Chen-Hua Chung
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90200-7
aggregate planning problemheuristics. direct search proceduremaster production scheduling problemmulti-item hierarchical production planning process
Related Items (1)
Cites Work
- Dynamic Version of the Economic Lot Size Model
- `` Direct Search Solution of Numerical and Statistical Problems
- Using Linear Programming to Derive Planning Horizons for a Production Smoothing Problem
- An Algorithm for the Dynamic Lot-Size Problem with Time-Varying Production Capacity Constraints
- Planning Horizons for the Dynamic Lot Size Model with Backlogging
- Planning Horizons for the Dynamic Lot Size Model: Zabel vs. Protective Procedures and Computational Results
- Production Smoothing with Fluctuating Price
- Horizon Effects in Aggregate Production Planning with Seasonal Demand
- Planning Horizons for Production Smoothing with Deterministic Demands
- General Planning Horizons for Production Smoothing with Deterministic Demands
- An Analytic Framework for Evaluating Rolling Schedules
- Extensions of the Planning Horizon Theorem in the Dynamic Lot Size Model
- Optimal Production Scheduling and Employment Smoothing with Deterministic Demands
- Production Planning Over Time and the Nature of the Expectation and Planning Horizon
This page was built for publication: Planning horizons for multi-item hierarchical production scheduling problems: A heuristic search procedure