Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

EBQ for a multistage production system considering rework

From MaRDI portal
Publication:1107427
Jump to:navigation, search

zbMath0652.90056MaRDI QIDQ1107427

R. S. V. Narasimha Rao, Subrata Chakraborty

Publication date: 1988

Published in: Opsearch (Search for Journal in Brave)


zbMATH Keywords

multistage production systemoptimum batch quantityoptimum number of cycles for rework


Mathematics Subject Classification ID

Production models (90B30)


Related Items (4)

Optimizing a production system with rework and equal sized batch shipments ⋮ Optimal batch sizing in a multi-stage production system with rework consideration ⋮ A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering ⋮ An inventory model for product life cycle with maturity stage and defective items




This page was built for publication: EBQ for a multistage production system considering rework

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1107427&oldid=13145417"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 03:01.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki