On the two-phase method for preemptive scheduling
From MaRDI portal
Publication:1107434
DOI10.1016/0377-2217(88)90332-3zbMath0652.90064OpenAlexW1988424649MaRDI QIDQ1107434
Publication date: 1988
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(88)90332-3
flexible manufacturing systemsparallel processorstotal unimodularitytwo-phase methodPreemptive schedulingminimum total completion time
Applications of mathematical programming (90C90) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Deterministic network models in operations research (90B10)
Related Items
Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches ⋮ On preemptive scheduling: A general setting for the two-phase method ⋮ Almost nonpreemptive schedules ⋮ A Survey on Approximation Algorithms for Scheduling with Machine Unavailability ⋮ Mathematical programming formulations for machine scheduling: A survey ⋮ A heuristic for scheduling in a two-stage hybrid flowshop with renewable resources shared among the stages
Cites Work