On a single-machine optimal constant due-date assignment and sequencing problem
From MaRDI portal
Publication:1110452
DOI10.1016/0893-9659(88)90096-1zbMath0656.90049OpenAlexW2069382920MaRDI QIDQ1110452
Publication date: 1988
Published in: Applied Mathematics Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0893-9659(88)90096-1
optimal solutionKuhn-Tucker conditionssingle-machine shopgeneral constrained optimizationoptimal constant due-date assignmentsequencing of jobs
Cites Work
This page was built for publication: On a single-machine optimal constant due-date assignment and sequencing problem