A continuous-time average-cost flexible manufacturing and operator scheduling model solved by deconvexification over time
DOI10.1016/0024-3795(89)90473-4zbMath0672.90067OpenAlexW2013556299MaRDI QIDQ1120468
B. Curtis Eaves, Uriel G. Rothblum
Publication date: 1989
Published in: Linear Algebra and its Applications (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0024-3795(89)90473-4
dynamic programbuffer inventoriescontinuous-time flexible manufacturingdeconvexificationsdeterministic, infinite-horizon, continuous-time discretedeterministic, infinite-horizon, continuous-time discrete dynamic programoperator schedulingsequence of linear programs
Numerical mathematical programming methods (65K05) Applications of mathematical programming (90C90) Linear programming (90C05) Deterministic scheduling theory in operations research (90B35) Production models (90B30) Dynamic programming (90C39)
Related Items (1)
Cites Work
This page was built for publication: A continuous-time average-cost flexible manufacturing and operator scheduling model solved by deconvexification over time