Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty
From MaRDI portal
Publication:1121167
DOI10.1016/0305-0548(89)90034-8zbMath0673.90056OpenAlexW1977113105MaRDI QIDQ1121167
Could not fetch data.
Publication date: 1989
Published in: (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(89)90034-8
Could not fetch data.
Could not fetch data.