V-shape property of optimal sequence of jobs about a common due date on a single machine
From MaRDI portal
Publication:1121777
DOI10.1016/0305-0548(89)90043-9zbMath0674.90046OpenAlexW2030162078MaRDI QIDQ1121777
C. R. Bector, Yash Pal Gupta, Mahesh C. Gupta
Publication date: 1989
Published in: Computers \& Operations Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0305-0548(89)90043-9
Related Items (5)
Survey of scheduling research involving due date determination decisions ⋮ A heuristic for single machine common due date assignment problem with different earliness/tardiness weights ⋮ Scheduling jobs on a machine subject to stochastic breakdowns to minimize absolute early-tardy penalties ⋮ Single machine scheduling with coefficient of variation minimization ⋮ Single machine scheduling with symmetric earliness and tardiness penalties
Cites Work
- Unnamed Item
- A V-shape property of optimal schedule of jobs about a common due date
- Minimizing the average deviation of job completion times about a common due date
- Minimizing mean absolute deviation of completion times about a common due date
- Determination of an optimal common due date and optimal sequence in a single machine job shop
- Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
This page was built for publication: V-shape property of optimal sequence of jobs about a common due date on a single machine