Scheduling of design projects with uncertain number of iterations
From MaRDI portal
Publication:1124816
DOI10.1016/S0377-2217(98)00027-7zbMath0947.90049OpenAlexW2127532365MaRDI QIDQ1124816
Feng Liu, Peter B. Luh, Bryan Moser
Publication date: 8 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(98)00027-7
integer programmingscheduling theorystochastic dynamic programmingrisk managementdesign project management
Integer programming (90C10) Stochastic programming (90C15) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39)
Related Items (3)
Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency ⋮ A CTMDP-Based Exact Method for RCPSP with Uncertain Activity Durations and Rework ⋮ A variable-grouping based genetic algorithm for large-scale integer programming
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- Scheduling subject to resource constraints: Classification and complexity
- Stochastic project networks. Temporal analysis, scheduling and cost minimization
- Surrogate gradient algorithm for Lagrangian relaxation
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Scheduling research in multiple resource constrained job shops: a review and critique
- Single Machine Scheduling Problems with General Breakdowns, Earliness and Tardiness Costs
This page was built for publication: Scheduling of design projects with uncertain number of iterations