Multiple period repair kit problem with a job completion criterion: A case study
From MaRDI portal
Publication:1129889
DOI10.1016/0377-2217(94)00177-EzbMath0927.90017OpenAlexW2048836763MaRDI QIDQ1129889
Publication date: 16 August 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00177-e
Related Items (7)
Optimising a general repair kit problem with a service constraint ⋮ The repair kit problem with imperfect advance demand information ⋮ Multiperiod integrated spare parts and tour planning for on-site maintenance activities with stochastic repair requests ⋮ The added value of advance demand information for the planning of a repair kit ⋮ The multiple-job repair kit problem ⋮ The repair kit problem with positive replenishment lead times and fixed ordering costs ⋮ Inventory control of service parts in the final phase: A central depot and repair kits
Cites Work
This page was built for publication: Multiple period repair kit problem with a job completion criterion: A case study