A procedure for the one-machine sequencing problem with dependent jobs
From MaRDI portal
Publication:1130073
DOI10.1016/0377-2217(93)E0322-OzbMath0920.90071OpenAlexW2093972119MaRDI QIDQ1130073
Publication date: 15 September 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)e0322-o
Related Items (4)
Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem ⋮ An exact approach for single machine subproblems in shifting bottleneck procedures for job shops with total weighted tardiness objective ⋮ Unnamed Item ⋮ Deterministic job-shop scheduling: Past, present and future
Cites Work
- Unnamed Item
- Unnamed Item
- A note on minimizing maximum lateness in a one-machine sequencing problem with release dates
- An algorithm for single machine sequencing with release dates to minimize maximum cost
- The one-machine sequencing problem
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Scheduling Unit–Time Tasks with Arbitrary Release Times and Deadlines
- On Scheduling with Ready Times and Due Dates to Minimize Maximum Lateness
- Minimizing maximum lateness on one machine: computational experience and some applications
- Some simple scheduling algorithms
- A modified shifting bottleneck procedure for job-shop scheduling
This page was built for publication: A procedure for the one-machine sequencing problem with dependent jobs