The use of fuzzy variables in PERT

From MaRDI portal
Publication:1148224

DOI10.1016/0165-0114(81)90030-0zbMath0451.90076OpenAlexW1978165925MaRDI QIDQ1148224

Jerzy Kamburowski, Stefan Chanas

Publication date: 1981

Published in: Fuzzy Sets and Systems (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0165-0114(81)90030-0



Related Items

Application of C‐uncertain variables and systemic approach to resource distribution in a class of operation systems, Production flow prototyping subject to imprecise activity specification, A procedure for ranking fuzzy numbers using fuzzy relations, Project network analysis with fuzzy activity times, Developing a heuristic algorithm for order production planning using network models under uncertainty conditions, Application of fuzzy distributions on project management, Applying fuzzy method for measuring criticality in project network, Criticality analysis of activity networks under interval uncertainty, The current interest in fuzzy optimization, Fuzzy decision networks and deconvolution, Fuzzy shortest path problems incorporating interactivity among paths., Solution of interval PERT/CPM network problems by a simplified tabular method, Fuzzy project scheduling problem and its hybrid intelligent algorithm, Modeling uncertain activity duration by fuzzy number and discrete-event simulation, New fuzzy models for time-cost trade-off problem, On computing the latest starting times and floats of activities in a network with imprecise durations, A path enumeration approach for the analysis of critical activities in fuzzy networks, Critical path analysis in the network with fuzzy activity times, On the latest starting times and criticality of activities in a network with imprecise durations, The computational complexity of the criticality problems in a network with interval activity times, Application of fuzzy sets to multi-objective project management decisions, A New Approach to Find Project Characteristics and Multiple Possible Critical Paths in a Fuzzy Project Network, Canonical fuzzy numbers of dimension two and fuzzy utility difference for understanding preferential judgments, Fuzzy probability vectors, Stochastic and fuzzy PERT, Computing latest starting times of activities in interval-valued networks with minimal time lags, Using fuzzy sets in operational research, Developing a mathematical model for scheduling and determining success probability of research projects considering complex-fuzzy networks, Using metric distance ranking method to find intuitionistic fuzzy critical path, Computing improved optimal solutions to max-min flexible constraint satisfaction problems, Real-valued flows in a network with fuzzy arc capacities, Modeling uncertainty in networks, Project management decisions using fuzzy linear programming, Fuzzy shortest paths, Unified approach to fuzzy graph problems, Fuzzy sets and statistical data, Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge, On latest starting times and floats in activity networks with ill-known durations



Cites Work