Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal flow-shop scheduling with earliness and tardiness penalties

From MaRDI portal
Publication:1159565
Jump to:navigation, search

zbMath0475.90043MaRDI QIDQ1159565

Jan Grabowski, N. R. Achuthan, Jeffrey B. Sidney

Publication date: 1981

Published in: Opsearch (Search for Journal in Brave)


zbMATH Keywords

branch-and-bound algorithmNP-completenesssufficient optimality conditionsmaximum tardiness problemearliness penaltymaximum penalty problemoptimal flow-shop schedulingtardiness penalties


Mathematics Subject Classification ID

Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)


Related Items

A decision support system for the resource constrained project scheduling problem



Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1159565&oldid=13222740"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 05:40.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki