Scheduling subject to nonrenewable-resource constraints

From MaRDI portal
Publication:1169397

DOI10.1016/0167-6377(82)90045-1zbMath0494.90041OpenAlexW2054486362MaRDI QIDQ1169397

S. Singh

Publication date: 1982

Published in: Operations Research Letters (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0167-6377(82)90045-1




Related Items (19)

Polynomial algorithms for single machine scheduling problems with financial constraintsBi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problemMinimizing makespan on a single machine with release dates and inventory constraintsApproximation schemes for single machine scheduling with non-renewable resource constraintsLower bounds for the event scheduling problem with consumption and production of resourcesA multivariate complexity analysis of the material consumption scheduling problemApproximation schemes for parallel machine scheduling with non-renewable resourcesScheduling of inventory releasing jobs to minimize a regular objective function of delivery timesA PTAS for a resource scheduling problem with arbitrary number of parallel machinesReductions between scheduling problems with non-renewable resources and knapsack problemsSingle machine scheduling problems with financial resource constraints: some complexity results and propertiesEPTAS for load balancing problem on parallel machines with a non-renewable resourceApproximability of total weighted completion time with resource consuming jobsOn single machine scheduling with resource constraintA tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resourceEPTAS for load balancing problem on parallel machines with a non-renewable resourcePreemptive scheduling of independent jobs on parallel machines subject to financial constraintsApproximating the optimal sequence of acquisitions and sales with a capped budgetApproximability of scheduling problems with resource consuming jobs




Cites Work




This page was built for publication: Scheduling subject to nonrenewable-resource constraints