Scheduling subject to nonrenewable-resource constraints
From MaRDI portal
Publication:1169397
DOI10.1016/0167-6377(82)90045-1zbMath0494.90041OpenAlexW2054486362MaRDI QIDQ1169397
Publication date: 1982
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(82)90045-1
polynomial time algorithmprecedence constrained schedulingdepletion time dependant job costminimal makespanminimization of maximum costnonrenewable-resource constraints
Analysis of algorithms and problem complexity (68Q25) Deterministic scheduling theory in operations research (90B35)
Related Items (19)
Polynomial algorithms for single machine scheduling problems with financial constraints ⋮ Bi-objective optimization algorithms for joint production and maintenance scheduling under a global resource constraint: application to the permutation flow shop problem ⋮ Minimizing makespan on a single machine with release dates and inventory constraints ⋮ Approximation schemes for single machine scheduling with non-renewable resource constraints ⋮ Lower bounds for the event scheduling problem with consumption and production of resources ⋮ A multivariate complexity analysis of the material consumption scheduling problem ⋮ Approximation schemes for parallel machine scheduling with non-renewable resources ⋮ Scheduling of inventory releasing jobs to minimize a regular objective function of delivery times ⋮ A PTAS for a resource scheduling problem with arbitrary number of parallel machines ⋮ Reductions between scheduling problems with non-renewable resources and knapsack problems ⋮ Single machine scheduling problems with financial resource constraints: some complexity results and properties ⋮ EPTAS for load balancing problem on parallel machines with a non-renewable resource ⋮ Approximability of total weighted completion time with resource consuming jobs ⋮ On single machine scheduling with resource constraint ⋮ A tight approximation ratio of a list scheduling algorithm for a single-machine scheduling problem with a non-renewable resource ⋮ EPTAS for load balancing problem on parallel machines with a non-renewable resource ⋮ Preemptive scheduling of independent jobs on parallel machines subject to financial constraints ⋮ Approximating the optimal sequence of acquisitions and sales with a capped budget ⋮ Approximability of scheduling problems with resource consuming jobs
Cites Work
This page was built for publication: Scheduling subject to nonrenewable-resource constraints