Scheduling with release dates on a single machine to minimize total weighted completion time

From MaRDI portal
Publication:1193720

DOI10.1016/0166-218X(92)90255-9zbMath0757.90032OpenAlexW1994429799MaRDI QIDQ1193720

Chris N. Potts, Hocine Belouadah, Marc E. Posner

Publication date: 27 September 1992

Published in: Discrete Applied Mathematics (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0166-218x(92)90255-9




Related Items

Single machine scheduling with two competing agents, arbitrary release dates and unit processing timesA hybrid genetic algorithm with dominance properties for single machine scheduling with dependent penaltiesApproximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability intervalExact algorithms for single-machine scheduling with time windows and precedence constraintsDominance-based heuristics for one-machine total cost scheduling problemsMinimizing the sum of weighted completion times with unrestricted weightsTwo-agent singe-machine scheduling with release times to minimize the total weighted completion timeA hybrid differential evolution approach based on surrogate modelling for scheduling bottleneck stagesOnline heuristic for the preemptive single machine scheduling problem of minimizing the total weighted completion timeScheduling jobs with release dates on identical parallel machines by minimizing the total weighted completion timeMinimizing total completion time on a single machine with a flexible maintenance activityGenerating artificial chromosomes with probability control in genetic algorithm for machine scheduling problemsEA/G-GA for single machine scheduling problems with earliness/tardiness costsDominance rules in combinatorial optimization problemsA global constraint for total weighted completion time for unary resourcesInfinite split scheduling: a new lower bound of total weighted completion time on parallel machines with job release dates and unavailability periodsA two-agent single-machine scheduling problem to minimize the total cost with release datesSingle-machine scheduling with no idle time and release dates to~minimize a regular criterionA dynamic-programming-based exact algorithm for general single-machine scheduling with machine idle timeFast approximation algorithms to minimize a special weighted flow-time criterion on a single machine with a non-availability interval and release datesReducibility among single machine weighted completion time scheduling problemsSingle-machine scheduling with an availability constraint to minimize the weighted sum of the completion timesA branch-and-bound algorithm for single-machine scheduling with batch delivery and job release timesA branch-and-bound algorithm to minimize total weighted completion time on identical parallel machines with job release datesEfficient heuristics to minimize total flow time with release datesNon-identical parallel-machine scheduling research with minimizing total weighted completion times: models, relaxations and algorithmsBranch-and-bound method for minimizing the weighted completion time scheduling problem on a single machine with release datesOn scheduling a single machine to minimize a piecewise linear objective function: A compact MIP formulationScheduling a single machine to minimize a regular objective function under setup constraintsAsymptotic analysis of an on-line algorithm for the single machine completion time problem with release datesAn exact approach to early/tardy scheduling with release datesOn the relationship between combinatorial and LP-based lower bounds for NP-hard scheduling problemsOnline Parallel-Machine Scheduling in KRT Environment to Minimize Total Weighted Completion TimeMetaheuristics to solve a tasks scheduling problem in parallel identical machines with unavailability periodsModeling single machine preemptive scheduling problems for computational efficiencyA unified heuristic and an annotated bibliography for a large class of earliness-tardiness scheduling problems



Cites Work