On the economic lot scheduling problem with backlogging: The common cycle approach
From MaRDI portal
Publication:1200773
DOI10.1016/0167-6377(92)90071-AzbMath0757.90016OpenAlexW1986048710MaRDI QIDQ1200773
Publication date: 16 January 1993
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0167-6377(92)90071-a
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- An approach to nonlinear programming
- Determination of economic production quantities for a two-product single machine system
- The Deterministic Dynamic Product Cycling Problem
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot Sizes
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling Problem
- The Economic Lot Scheduling Problem (ELSP): Review and Extensions
- Note—On the Deterministic Demand Multi-Product Single-Machine Lot Scheduling Problem
- Technical Note—Mathematical Pitfalls in the One Machine Multiproduct Economic Lot Scheduling Problem
- Testing Feasibility in a Lot Scheduling Problem
- A Dynamic Programming Approach to a Lot Size Scheduling Problem
This page was built for publication: On the economic lot scheduling problem with backlogging: The common cycle approach