Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Use of variable range in solving multiple criteria scheduling problems

From MaRDI portal
Publication:1200841
Jump to:navigation, search

DOI10.1016/0305-0548(92)90074-FzbMath0825.90531OpenAlexW2073825725MaRDI QIDQ1200841

Rong-Hwa Huang, Ching-Jong Liao, Sheng-Tsaing Tseng

Publication date: 16 January 1993

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(92)90074-f



Mathematics Subject Classification ID

Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)


Related Items

Single-machine scheduling with maintenance in a manufacturing system



Cites Work

  • Unnamed Item
  • Unnamed Item
  • Tradeoff solutions in single machine production scheduling for minimizing flow time and maximum penalty
  • Solving a bicriterion scheduling problem
  • A bicriterion approach to time/cost trade-offs in sequencing
  • A note on the single-machine scheduling problem with minimum weighted completion time and maximum allowable tardiness
  • Scheduling with Multiple Performance Measures: The One-Machine Case
  • One machine sequencing to minimize mean flow time with minimum number tardy
  • A note on the extension of a result on scheduling with secondary criteria
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1200841&oldid=13263421"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 06:59.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki