Stochastic project networks. Temporal analysis, scheduling and cost minimization
zbMath0779.90029MaRDI QIDQ1202111
Publication date: 23 January 1993
Published in: Lecture Notes in Economics and Mathematical Systems (Search for Journal in Brave)
single-machine schedulingMarkov renewal processesprecedence constraintspolicy iterationcost minimizationproject planninganalytical networksGERT networksmaximum expected latenessstochastic project networkstemporal analysisweighted expected flow-time
Stochastic network models in operations research (90B15) Deterministic scheduling theory in operations research (90B35) Dynamic programming (90C39) Performance evaluation, queueing, and scheduling in the context of computer systems (68M20) Research exposition (monographs, survey articles) pertaining to operations research and mathematical programming (90-02) Applications of Markov renewal processes (reliability, queueing networks, etc.) (60K20)
Related Items (9)
This page was built for publication: Stochastic project networks. Temporal analysis, scheduling and cost minimization