A heuristic for preemptive scheduling with set-up times

From MaRDI portal
Publication:1202243
Jump to:navigation, search

DOI10.1007/BF02238747zbMath0773.90039MaRDI QIDQ1202243

Zhongliang Yu, Gerhard J. Woeginger

Publication date: 25 February 1993

Published in: Computing (Search for Journal in Brave)


zbMATH Keywords

heuristicspolynomial time approximation algorithmNP-completepreemptive schedulingidentical parallel machines\(m\) parallel machinesconstant (job- and machine-independent) set-up timesworst- case analysis


Mathematics Subject Classification ID

Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)


Related Items (1)

Strategic Scheduling Games: Equilibria and Efficiency



Cites Work

  • Unnamed Item
  • Time bounds for selection
  • Scheduling with Deadlines and Loss Functions
  • Performance Guarantees for Scheduling Algorithms
  • On the Complexity of Scheduling with Batch Setup Times
  • Analysis of Heuristics for Preemptive Parallel Machine Scheduling with Batch Setup Times
  • Bounds for Certain Multiprocessing Anomalies
  • Bounds on Multiprocessing Timing Anomalies




This page was built for publication: A heuristic for preemptive scheduling with set-up times

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1202243&oldid=13265389"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 06:04.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki