Profit-based FMS dynamic part type selection over time for mid-term production planning
From MaRDI portal
Publication:1206598
DOI10.1016/0377-2217(92)90054-DzbMath0825.90470OpenAlexW2123765727MaRDI QIDQ1206598
Eugeniusz Toczyłowski, Kathryn E. Stecke
Publication date: 1 April 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(92)90054-d
Related Items (5)
Importance of verifying queue model assumptions before planning with simulation software ⋮ A dynamic heuristic-based algorithm to part input sequencing in flexible manufacturing systems for mass customization capability ⋮ An implementation framework for seru production ⋮ Sequencing jobs for an automated manufacturing module with buffer ⋮ An improved part grouping model for minimizing makespan in FMS
Cites Work
- A Linear Programming Approach to the Cutting-Stock Problem
- Surrogate Dual Multiplier Search Procedures in Integer Programming
- Formulation and Solution of Nonlinear Integer Production Planning Problems for Flexible Manufacturing Systems
- Aggregation of Resource Constraints for Groups of Similar Components in Manufacturing Systems
- Surrogate Constraint Duality in Mathematical Programming
This page was built for publication: Profit-based FMS dynamic part type selection over time for mid-term production planning