A sequencing problem in the weaving industry
From MaRDI portal
Publication:1207057
DOI10.1016/0377-2217(93)90206-3zbMath0766.90036OpenAlexW1981403497MaRDI QIDQ1207057
Mohamad H. Al-Haboubi, Shokri Z. Selim
Publication date: 3 May 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90206-3
Deterministic scheduling theory in operations research (90B35) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items
Setup coordination between two stages of a production system: a multi-objective evolutionary approach ⋮ A bi-objective coordination setup problem in a two-stage production system ⋮ Low-complexity algorithms for sequencing jobs with a fixed number of job-classes
Cites Work