Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Algorithms for sequencing robot activities in a robot-centered parallel- processor workcell

From MaRDI portal
Publication:1207209
Jump to:navigation, search

DOI10.1016/0305-0548(93)90074-SzbMath0759.90040OpenAlexW2138428292MaRDI QIDQ1207209

James T. Lin, Ue-Pyng Wen, Wu-Der Jeng

Publication date: 1 April 1993

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(93)90074-s


zbMATH Keywords

branch and boundrobot-centered parallel-processor workcellsequencing robot activities


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30) Automated systems (robots, etc.) in control theory (93C85) Computational methods for problems pertaining to operations research and mathematical programming (90-08)


Related Items

Combinatorial optimization models for production scheduling in automated manufacturing systems



Cites Work

  • Scheduling Parts in a Combined Production-transportation Work Cell
  • Mathematical Analysis Of A Robotized Production Cell
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1207209&oldid=13274295"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 07:24.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki