A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops

From MaRDI portal
Publication:1260741

DOI10.1016/0305-0548(93)90083-UzbMath0779.90043OpenAlexW1981936740MaRDI QIDQ1260741

Yeong-Dae Kim

Publication date: 25 August 1993

Published in: Computers \& Operations Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0305-0548(93)90083-u




Related Items

Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problemUsing two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applicationsOrder acceptance and scheduling problems in two-machine flow shops: new mixed integer programming formulationsNote on minimizing total tardiness in a two-machine flowshopAn assignment-based lower bound for a class of two-machine flow shop problemsMinimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup timesA branch and bound algorithm to minimize the total tardiness for \(m\)-machine permutation flowshop problemsMinimizing makespan in a two-machine flowshop with a limited waiting time constraint and sequence-dependent setup timesAn order scheduling problem with position-based learning effectA self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup timesMinimizing total tardiness in permutation flowshopsHeuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing timesTwo-machine flow shop total tardiness scheduling problem with deteriorating jobsAlgorithms for a two‐machine flowshop problem with jobs of two classesScheduling for a flow shop with waiting time constraints and missing operations in semiconductor manufacturingTwo-machine no-wait flowshop scheduling problem with uncertain setup times to minimize maximum latenessMinimising total tardiness in the \(m\)-machine flowshop problem: A review and evaluation of heuristics and metaheuristicsA better dominance relation and heuristics for two-machine no-wait flowshops with maximum lateness performance measureA scheduling problem to minimize total weighted tardiness in the two-stage assembly flowshopA cooperative dispatching approach for minimizing mean tardiness in a dynamic flowshopA branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardinessMinimizing tardiness in a two-machine flow-shopA two-stage assembly-type flowshop scheduling problem for minimizing total tardinessAlgorithms for minimizing the number of tardy jobs for reducing production cost with uncertain processing timesTwo-stage assembly scheduling problem for minimizing total tardiness with setup timesHeuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespanA guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problemSearch heuristics for a flowshop scheduling problem in a printed circuit board assembly processMinimizing total tardiness on a two-machine re-entrant flowshopA PSO and a tabu search heuristics for the assembly scheduling problem of the two-stage distributed database application



Cites Work