A due date assignment algorithm for multiproduct manufacturing facilities
From MaRDI portal
Publication:1261379
DOI10.1016/0377-2217(93)90332-HzbMath0776.90031OpenAlexW2067171905MaRDI QIDQ1261379
Hanan Luss, Moshe B. Rosenwein
Publication date: 28 November 1993
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(93)90332-h
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Computational methods for problems pertaining to operations research and mathematical programming (90-08)
Related Items (2)
Real-time due-date promising by build-to-order environments ⋮ Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms
Cites Work
- Unnamed Item
- Survey of scheduling research involving due date determination decisions
- An application of lagrangean decomposition to the resource-constrained minimum weighted arborescence problem
- The Lagrangian Relaxation Method for Solving Integer Programming Problems
- A Simulation Study of Predictable Due-Dates
- Validation of subgradient optimization
This page was built for publication: A due date assignment algorithm for multiproduct manufacturing facilities