Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem

From MaRDI portal
Publication:1265840
Jump to:navigation, search

DOI10.1016/S0305-0548(97)00028-2zbMath0907.90184MaRDI QIDQ1265840

Christos P. Koulamas

Publication date: 27 September 1998

Published in: Computers \& Operations Research (Search for Journal in Brave)


zbMATH Keywords

two-machine flowshoptotal tardinessguaranteed accuracy shifting bottleneck algorithm


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (1)

A hybrid scheduling approach for a two-stage flexible flow shop with batch processing machines



Cites Work

  • Unnamed Item
  • Unnamed Item
  • The two-machine flowshop scheduling problem with total tardiness
  • A new branch and bound algorithm for minimizing mean tardiness in two- machine flowshops
  • A decomposition algorithm for the single machine total tardiness problem
  • Optimal two- and three-stage production schedules with setup times included
  • Minimizing Total Tardiness on One Machine is NP-Hard
  • The Total Tardiness Problem: Review and Extensions
  • Heuristics for Flowshop Scheduling Problems Minimizing Mean Tardiness
  • A $k$-Sample Model in Order Statistics


This page was built for publication: A guaranteed accuracy shifting bottleneck algorithm for the two-machine flowshop total tardiness problem

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1265840&oldid=13365173"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 09:43.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki