The two-machine total completion time flow shop problem

From MaRDI portal
Publication:1266536

DOI10.1016/0377-2217(95)00351-7zbMath0916.90148OpenAlexW2063552989MaRDI QIDQ1266536

K. Appert

Publication date: 7 October 1998

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(95)00351-7




Related Items (42)

Flow shop non-idle scheduling and resource-constrained schedulingThe two-machine flowshop total completion time problem: improved lower bounds and a branch-and-bound algorithmA branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtimeRescheduling problems with allowing for the unexpected new jobs arrivalAn effective differential evolution algorithm for permutation flow shop scheduling problemUsing two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applicationsA branch-and-bound algorithm and four metaheuristics for minimizing total completion time for a two-stage assembly flow-shop scheduling problem with learning considerationMinimizing total completion time in a two-machine flow shop with deteriorating jobsThe two-machine flowshop total completion time problem: branch-and-bound algorithms based on network-flow formulationTwo-stage three-machine assembly scheduling problem with sum-of-processing-times-based learning effectAn assignment-based lower bound for a class of two-machine flow shop problemsA tabu method for a two-agent single-machine scheduling with deterioration jobsAn investigation on a two-agent single-machine scheduling problem with unequal release datesLower bounds for minimizing total completion time in a two-machine flow shopGeneralized pairwise interchanges and machine schedulingA new variable neighbourhood search with a constraint programming search strategy for the open shop scheduling problem with operation repetitionsEnhanced lower bounds and exact procedures for total completion time minimization in a two‐machine permutation flowshop with release datesMinimizing total weighted completion time in a two-machine flow shop scheduling under simple linear deteriorationTabu search algorithms for minimizing total completion time on a single machine with an actual time-dependent learning effectMinimizing the makespan for a two-stage three-machine assembly flow shop problem with the sum-of-processing-time based learning effectA branch-and-bound algorithm for a single machine sequencing to minimize the total tardiness with arbitrary release dates and position-dependent learning effectsA SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOPA bicriteria flowshop scheduling with a learning effectTwo machine flow shop scheduling problem with weighted WIP costsAn iterated local search algorithm for the permutation flowshop problem with total flowtime criterionA two-machine flowshop scheduling problem with a truncated sum of processing-times-based learning functionFlow shops with WIP and value added costsTwo-agent scheduling with position-based deteriorating jobs and learning effectsA honey-bees optimization algorithm for a two-agent single-machine scheduling problem with ready timesA two-machine flowshop problem with two agentsRe-entrant flowshop scheduling with learning considerations to minimize the makespanThe single-machine total tardiness problem with unequal release times and a linear deteriorationA matheuristic approach for the two-machine total completion time flow shop problemA bicriteria approach to the two-machine flow shop scheduling problemA robust two-machine flow-shop scheduling model with scenario-dependent processing timesA bicriteria two-machine permutation flowshop problemEmpirically discovering dominance relations for scheduling problems using an evolutionary algorithmNon-clairvoyant weighted flow time scheduling on different multi-processor modelsAn improved branch-and-bound algorithm for the two machine total completion time flow shop problemThe two- and \(m\)-machine flowshop scheduling problems with bicriteria of makespan and mean flowtimeThe two-machine flowshop scheduling problem with sequence-independent setup times: new lower bounding strategiesTwo-machine flowshop scheduling with a secondary criterion



Cites Work


This page was built for publication: The two-machine total completion time flow shop problem