A framework for an interactive project scheduling system under limited resources
From MaRDI portal
Publication:1266550
DOI10.1016/0377-2217(95)00360-6zbMath0916.90157OpenAlexW2019138501MaRDI QIDQ1266550
Publication date: 7 October 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00360-6
Related Items (5)
A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows ⋮ Optimization of a highway project planning using a modified genetic algorithm ⋮ Project network models with discounted cash flows a guided tour through recent developments ⋮ Improving project cost estimation by taking into account managerial flexibility ⋮ Resource-constrained project scheduling through the goal programming model: integration of the manager's preferences
Cites Work
- Some efficient multi-heuristic procedures for resource-constrained project scheduling
- The scheduling of activities to maximize the net present value of projects
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- Scheduling subject to resource constraints: Classification and complexity
- A local constraint based analysis approach to project scheduling under general resource constraints
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Scheduling a project to maximize its net present value: An integer programming approach
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- Hierarchical models for multi-project planning and scheduling
- Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case
- Project scheduling: The effects of problem structure on heuristic performance
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
- A constraint-based perspective in resource constrained project scheduling
- Solving resource-constrained project scheduling problems by a* search
This page was built for publication: A framework for an interactive project scheduling system under limited resources