Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Setting planned lead times for multi-operation jobs

From MaRDI portal
Publication:1266593
Jump to:navigation, search

DOI10.1016/0377-2217(94)00203-7zbMath0913.90137OpenAlexW2002799964MaRDI QIDQ1266593

Hitoshi Tsubone, Haruki Matsuura, Masakazu Kanezashi

Publication date: 7 October 1998

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)00203-7

zbMATH Keywords

bottleneck machineperiodic loadingplanned lead timesPoisson job arrival


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35) Production models (90B30)


Related Items

Setting optimal planned leadtimes in configure-to-order assembly systems, Managing stochastic, finite capacity, multi-project systems through the cross-entropy methodology, Time bucket length and lot-splitting approach



Cites Work

  • Unnamed Item
  • Unnamed Item
  • A Tactical Planning Model for a Job Shop
  • Lot Sizes, Lead Times and In-Process Inventories
  • A Simulation Study of Predictable Due-Dates
  • Setting Planned Leadtimes in Capacity Requirements Planning
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1266593&oldid=13367433"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 10:44.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki