Project management with time, cost, and quality considerations
From MaRDI portal
Publication:1266596
DOI10.1016/0377-2217(94)00202-9zbMath0913.90157OpenAlexW1982177929MaRDI QIDQ1266596
Publication date: 7 October 1998
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00202-9
Related Items
Solving multi-mode time–cost–quality trade-off problems under generalized precedence relations ⋮ A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search ⋮ On the discrete time, cost and quality trade-off problem ⋮ Optimizing temporary work and overtime in the time cost quality trade-off problem ⋮ Longitudinal cooperative robust optimization model for sustainable supply chain management ⋮ Integrating risk into estimations of project activities' time and cost: a stratified approach ⋮ Multimode resource-constrained project scheduling in flexible projects ⋮ Project management with time, cost, and quality considerations ⋮ A robust time-cost-quality-energy-environment trade-off with resource-constrained in project management: a case study for a bridge construction project
Cites Work
- Unnamed Item
- Project management with time, cost, and quality considerations
- A Network Flow Computation for Project Cost Curves
- Critical-Path Planning and Scheduling: Mathematical Basis
- Note—A Note on “A Simple CPM Time-Cost Tradeoff Algorithm”
- A Simple CPM Time-Cost Tradeoff Algorithm
- Critical Path Problems with Concave Cost-Time Curves