A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis
From MaRDI portal
Publication:1266705
DOI10.1016/0377-2217(94)00272-XzbMath0922.90087MaRDI QIDQ1266705
Publication date: 18 October 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
heuristicsproject schedulingresource allocationproject durationforward/backward schedulingiterative schedulinglocal constraint based analysis
Related Items (13)
New strategies for stochastic resource-constrained project scheduling ⋮ Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP ⋮ Experimental investigation of heuristics for resource-constrained project scheduling: an update ⋮ A hybrid metaheuristic for the resource-constrained project scheduling problem ⋮ A hybrid genetic algorithm for the resource-constrained project scheduling problem ⋮ New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing ⋮ Justification and RCPSP: a technique that pays ⋮ An efficient multi-pass heuristic for project scheduling with constrained resources ⋮ Activity list representation for a generalization of the resource-constrained project scheduling problem ⋮ Bidirectional planning: Improving priority rule-based heuristics for scheduling resource-constrained projects ⋮ A hybrid scatter search/electromagnetism meta-heuristic for project scheduling ⋮ Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem ⋮ A multicriteria heuristic method to improve resource allocation in multiproject scheduling
Cites Work
- An iterative scheduling technique for resource-constrained project scheduling
- A local constraint based analysis approach to project scheduling under general resource constraints
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling
- A constraint-based perspective in resource constrained project scheduling
This page was built for publication: A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis