Parallel machine scheduling to maximize the minimum load with nonsimultaneous machine available times
From MaRDI portal
Publication:1271384
DOI10.1016/S0167-6377(97)00053-9zbMath0912.90175OpenAlexW2046677007MaRDI QIDQ1271384
Enyu Yao, Guo-Hui Lin, Yong He
Publication date: 18 February 1999
Published in: Operations Research Letters (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0167-6377(97)00053-9
matchingmultiprocessor schedulingapproximationLPTweighting functionworst-case performance ratiogeneralized versionclassical parallel machine schedulingminimum machine completion time
Related Items
Parallel-machine scheduling with non-simultaneous machine available time ⋮ Minimizing total load on parallel machines with linear deterioration ⋮ The LPT heuristic for minimizing total load on a proportionate openshop ⋮ Multi-machine scheduling with deteriorating jobs and scheduled maintenance ⋮ Scheduling jobs with service level requirements on parallel machines under availability and eligibility constraints
Cites Work