Project network models with discounted cash flows a guided tour through recent developments
From MaRDI portal
Publication:1278075
DOI10.1016/S0377-2217(96)00112-9zbMath0947.90583OpenAlexW2059278764MaRDI QIDQ1278075
Patrick van Dommelen, Erik L. Demeulemeester, Willy S. Herroelen
Publication date: 22 April 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/s0377-2217(96)00112-9
Related Items
The discrete time/cost trade-off problem: Extensions and heuristic procedures, Investment, financing and the role of ROA and WACC in value creation, Integration of equipment planning and project scheduling, Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap, An optimization model for stochastic project networks with cash flows, Project scheduling and equipment planning with random breakdowns, Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap, Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach, Project scheduling with finite or infinite number of activity processing modes -- a survey, Order-based neighborhoods for project scheduling with nonregular objective functions., Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty, Resource-constrained project scheduling: A survey of recent developments., Predetermined intervals for start times of activities in the stochastic project scheduling problem, Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms, Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology, Multi-project scheduling with two-stage decomposition, Chisini means and rational decision making: equivalence of investment criteria, Discrete-continuous project scheduling with discounted cash flows - a tabu search approach, Scheduling jobs on a single machine to maximize the total revenue of jobs, Optimizing version release dates of research and development long-term processes, Capital- and resource-constrained project scheduling with net present value optimization, Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems, Maximizing the expected net present value of a project with phase-type distributed activity durations: an efficient globally optimal solution procedure, Investment decisions and sensitivity analysis: NPV-consistency of rates of return, Metaheuristics for multi-mode capital-constrained project payment scheduling, Setting gates for activities in the stochastic project scheduling problem through the cross entropy methodology, Single-pass and approximate dynamic-programming algorithms for order acceptance and capacity planning, Multi-mode project payment scheduling problems with bonus-penalty structure, An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs, Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models, A survey of variants and extensions of the resource-constrained project scheduling problem, Client‐contractor bargaining on net present value in project scheduling with limited resources, Pricing and two-tier advertising with one manufacturer and one retailer, Resource-constrained project scheduling: Notation, classification, models, and methods, Simulated annealing for financing cost distribution based project payment scheduling from a joint perspective, Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results, An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations, Ensuring quality in resource constrained project scheduling, Maximizing the net present value of a project under uncertainty, Simulated annealing and tabu search for multi-mode project payment scheduling, Scheduling projects with stochastic activity duration to maximize expected net present value, A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations, Improving project cost estimation by taking into account managerial flexibility, An equitable approach to the payment scheduling problem in project management, Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints
Cites Work
- Unnamed Item
- Unnamed Item
- The scheduling of activities to maximize the net present value of projects
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems
- A comparison of stochastic scheduling rules for maximizing project net present value
- Multiobjective network scheduling with efficient use of renewable and nonrenewable resources
- Computational experience with an optimal procedure for the scheduling of activities to maximize the net present value of projects
- A framework for an interactive project scheduling system under limited resources
- A note on ``Hierarchical models for multi-project planning and scheduling
- Comment on Elmaghraby and Herroelen's ``The scheduling of activities to maximize the net present value of projects
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows
- Activity nets: A guided tour through some recent developments
- Project scheduling with resource constraints: A branch and bound approach. Note by Frederik Kaefer
- Scheduling a project to maximize its net present value: An integer programming approach
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach
- Hierarchical models for multi-project planning and scheduling
- A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem
- Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach
- An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems
- On modelling payments in projects
- A Branch and Bound Procedure for the Resource Constrained Project Scheduling Problem with Discounted Cash Flows
- Performance of the heuristic procedures for constrained projects with progress payments
- Heuristic scheduling of resource-constrained projects with cash flows
- New Benchmark Results for the Resource-Constrained Project Scheduling Problem
- Solving time/cost trade-off problems with discounted cash flows using generalized benders decomposition
- Cash Flows in Networks
- The payment scheduling problem
- Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems
- Project Scheduling with Discounted Cash Flows and Progress Payments