Optimal production cycles, procurement schedules, and joint investment in an imperfect production system
From MaRDI portal
Publication:1278120
DOI10.1016/S0377-2217(96)00160-9zbMath0921.90079MaRDI QIDQ1278120
Publication date: 18 May 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Related Items (7)
Optimal production run length and capital investment in quality improvement with an imperfect production process ⋮ Two-echelon inventory optimization for imperfect production system under quality competition environment ⋮ A continuous review inventory model with controllable backorder rate and investments ⋮ An EPQ model with setup cost and process quality as functions of capital expenditure ⋮ An optimal policy for a single-vendor and a single-buyer integrated system with setup cost reduction and process-quality improvement ⋮ Investing in setup reduction in the EOQ Model with random yields under a Limited Capital Budget ⋮ Economic production quantity with imperfect production processes and learning effects
Cites Work
- Joint investment in quality improvement and setup reduction
- Optimal and Heuristic Procedures for Component Lot-Splitting in Multi-Stage Manufacturing Systems
- Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction
- JIT purchasing and setup reduction in an integrated inventory model
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly Systems
- An Integrated Inventory Model for a Single Product System
This page was built for publication: Optimal production cycles, procurement schedules, and joint investment in an imperfect production system