\(V\)-shape property for job sequences that minimize the expected completion time variance
From MaRDI portal
Publication:1278193
DOI10.1016/0377-2217(95)00097-6zbMath0947.90593OpenAlexW2104076354MaRDI QIDQ1278193
Publication date: 8 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00097-6
Related Items
Job scheduling methods for reducing waiting time variance ⋮ A lower bound for weighted completion time variance ⋮ Scheduling jobs with position and sum-of-processing-time based processing times
Cites Work
- Unnamed Item
- A V-shape property of optimal schedule of jobs about a common due date
- Mimimization of agreeably weighted variance in single machine systems
- V-shape property for optimal schedules with monotone penalty functions
- Minimizing weighted number of tardy jobs and weighted earliness-tardiness penalties about a common due date
- Sequencing with Earliness and Tardiness Penalties: A Review
- Minimizing Variation of Flow Time in Single Machine Systems
- Earliness-Tardiness Scheduling Problems, I: Weighted Deviation of Completion Times About a Common Due Date
- Earliness–Tardiness Scheduling Problems, II: Deviation of Completion Times About a Restrictive Common Due Date
- On the Minimization of Completion Time Variance with a Bicriteria Extension
- Minimising Waiting Time Variance in the Single Machine Problem
- Deterministic and Random Single Machine Sequencing with Variance Minimization
- Minimizing the Flow-time Variance in Single-machine Systems
- Variance Minimization in Single Machine Sequencing Problems