Sevast'yanov's algorithm for the flow-shop scheduling problem
From MaRDI portal
Publication:1278200
DOI10.1016/0377-2217(94)00356-4zbMath0947.90591OpenAlexW2019054090MaRDI QIDQ1278200
Publication date: 8 November 2000
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(94)00356-4
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (6)
An improved NEH heuristic to minimize makespan in permutation flow shops ⋮ A note on scheduling flowshops with flexible stage ordering ⋮ A new lower bounding rule for permutation flow shop scheduling ⋮ An empirical analysis of the optimality rate of flow shop heuristics ⋮ A new constructive heuristic for the flowshop scheduling problem ⋮ Performance guarantees for flowshop heuristics to minimize makespan
Uses Software
Cites Work
- Unnamed Item
- Unnamed Item
- Some efficient heuristic methods for the flow shop sequencing problem
- A new heuristic method for the flow shop sequencing problem
- A new heuristic for the n-job, M-machine flow-shop problem
- Optimal two- and three-stage production schedules with setup times included
- Some Numerical Experiments for an M × J Flow Shop and its Decision-Theoretical Aspects
- A Dynamic Programming Approach to Sequencing Problems
- The Shifting Bottleneck Procedure for Job Shop Scheduling
- Bounding algorithm for the routing problem with arbitrary paths and alternative servers
- The Lessons of Flowshop Scheduling Research
- On general routing problems
- An Evaluation of Flow Shop Sequencing Heuristics
- The Complexity of Flowshop and Jobshop Scheduling
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
This page was built for publication: Sevast'yanov's algorithm for the flow-shop scheduling problem