Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs

From MaRDI portal
Publication:1278242

DOI10.1016/0377-2217(94)00339-4zbMath0924.90085OpenAlexW2020625389MaRDI QIDQ1278242

Ping Yang, John J. Liu

Publication date: 10 November 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(94)00339-4




Related Items (27)

Using fuzzy analytic hierarchy process and particle swarm optimisation for balanced and defective supply chain problems considering WEEE/RoHS directivesA rework-based dispatching algorithm for module process in TFT-LCD manufactureEffect of repair cost on the rework decision-making in an economic production quantity modelDetermining the optimal lot size for the finite production model with an imperfect rework process of defective itemsOptimal economic production quantity policy for imperfect process with imperfect repair and maintenanceOptimizing a production system with rework and equal sized batch shipmentsIntegrated supply chain cooperative inventory model with payment period being dependent on purchasing price under defective rate conditionOptimal production correction and maintenance policy for imperfect processOptimum policy for a production system with major repair and preventive maintenanceMathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipmentsThree-layer supply chain - A production-inventory model for reworkable itemsOptimal product quality of supply chain based on information traceability in fashion and textiles industry: an adverse logistics perspectiveProduction lot size problem with failure in repair and backlogging derived without derivativesDisposal versus rework -- inventory control in a production system with random yieldA three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple itemsA production policy considering reworking of imperfect items and trade creditEconomic ordering policy for an item with imperfect quality subject to the in-house inspectionOptimal replenishment policy for imperfect quality EMQ model with rework and backloggingDetermining a threshold control policy for an imperfect production system with rework jobsAn optimal batch size for an imperfect production system with quality assurance and reworkOn reworks in a serial process with flexible windows of timeMathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assuranceLot sizing in a production system with rework and product deteriorationNumerical method for determination of reworking or scraping the defective items in a finite production rate modelNumerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and reworkBatching work and rework processes with limited deterioration of reworkablesOptimal economic production quantity policy for randomly failing process with minimal repair, backorder and preventive maintenance



Cites Work


This page was built for publication: Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs