Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Discrete-continuous scheduling problems -- mean completion time results

From MaRDI portal
Publication:1278310
Jump to:navigation, search

DOI10.1016/0377-2217(96)00130-0zbMath0953.90521OpenAlexW2055224357MaRDI QIDQ1278310

Joanna Józefowska, Jan Weglarz

Publication date: 22 February 1999

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/0377-2217(96)00130-0


zbMATH Keywords

scheduling theoryparallel machine schedulingcontinuous resourcemean completion time


Mathematics Subject Classification ID

Deterministic scheduling theory in operations research (90B35)


Related Items (3)

Scheduling shared continuous resources on many-cores ⋮ Makespan optimization in a single-machine scheduling problem with dynamic job ready times-complexity and algorithms ⋮ Resource level minimization in the discrete-continuous scheduling



Cites Work

  • Unnamed Item
  • Unnamed Item
  • On a methodology for discrete-continuous scheduling
  • Approximation algorithms for some discrete-continuous scheduling problems
  • Parallel Machine Scheduling: Processing Rates Dependent on Number of Jobs in Operation
  • Multiprocessor Scheduling with Memory Allocation—A Deterministic Approach


This page was built for publication: Discrete-continuous scheduling problems -- mean completion time results

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1278310&oldid=13380955"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 31 January 2024, at 11:03.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki