Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
From MaRDI portal
Publication:1278361
DOI10.1016/0377-2217(95)00254-5zbMath0955.90512OpenAlexW1969271858MaRDI QIDQ1278361
Julian Scott Yeomans, George Steiner
Publication date: 4 March 2001
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00254-5
Integer programming (90C10) Nonlinear programming (90C30) Deterministic scheduling theory in operations research (90B35)
Related Items (11)
Output Rate Variation Problem: Some Heuristic Paradigms and Dynamic Programming ⋮ The maximum deviation just-in-time scheduling problem. ⋮ Unnamed Item ⋮ Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches ⋮ Solving the car sequencing problem via branch \& bound ⋮ Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems ⋮ Constrained group balancing: why does it work ⋮ Sequencing mixed-model assembly lines: survey, classification and model critique ⋮ Note on cyclic sequences in the product rate variation problem ⋮ Solving balanced multi-weighted attribute set partitioning problem with variable neighborhood search ⋮ Interactive bicriterion decision support for a large scale industrial scheduling system
Cites Work
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Minimizing variation of production rates in just-in-time systems: A survey
- Material allocation in MRP with tardiness penalties
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- Level Schedules for Mixed-Model, Just-in-Time Processes
This page was built for publication: Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging