Minimizing the schedule length for a parallel 3D-grid precedence graph
From MaRDI portal
Publication:1278401
DOI10.1016/0377-2217(95)00297-9zbMath0947.90575OpenAlexW2080512320MaRDI QIDQ1278401
Evripidis Bampis, Denis Trystram, Jean-Claude Konig
Publication date: 22 February 1999
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/0377-2217(95)00297-9
Related Items (1)
Cites Work
- A state-of-the-art review of parallel-machine scheduling research
- Parallel Gaussian elimination on an MIMD computer
- Optimal scheduling algorithms for parallel Gaussian elimination
- Impact of communications of the complexity of the parallel Gaussian elimination
- Scheduling Multiprocessor Tasks to Minimize Schedule Length
- A Communication-Time Tradeoff
- Solving Linear Algebraic Equations on an MIMD Computer
- Unnamed Item
- Unnamed Item
This page was built for publication: Minimizing the schedule length for a parallel 3D-grid precedence graph